Upgrade Membership

For Supplier

supplier help center

Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble

Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble - Image 1
Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble - Image 1

Negotiable


Product information

High-quality Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble supplied by Concord Electrical Industries. Bulk wholesale pricing is negotiable. Inquiry for latest prices.

Minimum Creepage Distance:

16 Or 20 Mm/kv For Light Or Normal Pollution Level And 25 Or 31 Mm/kv For Heavy Or Very Heavy Pollution Level

Insulator Creepage Factor:

3.5 For Light Or Normal Pollution Level And 4.0 For Heavy Or Very Heavy Pollution Level

Secondary Terminal Location:

Brought Out In The Secondary Terminal Box On The Side Of The Tank

Primary Winding Material:

Coated Synthetic Enamel Round Copper Wire

Transformer Oil Specification:

Dried And Degassed Oil Conforming To Is:335

Vt Insulation Drying Method:

Dried Out By Heating In Vacuum

Oil Expansion Management:

Filling Dry Air Above Oil In The Top Chamber At Atmospheric Pressure

Insulator Type:

Hollow Porcelain Insulator Conforming To Is: 5621

Specifications

Minimum Creepage Distance:

16 Or 20 Mm/kv For Light Or Normal Pollution Level And 25 Or 31 Mm/kv For Heavy Or Very Heavy Pollution Level

Insulator Creepage Factor:

3.5 For Light Or Normal Pollution Level And 4.0 For Heavy Or Very Heavy Pollution Level

Secondary Terminal Location:

Brought Out In The Secondary Terminal Box On The Side Of The Tank

Primary Winding Material:

Coated Synthetic Enamel Round Copper Wire

Transformer Oil Specification:

Dried And Degassed Oil Conforming To Is:335

Vt Insulation Drying Method:

Dried Out By Heating In Vacuum

Oil Expansion Management:

Filling Dry Air Above Oil In The Top Chamber At Atmospheric Pressure

Insulator Type:

Hollow Porcelain Insulator Conforming To Is: 5621

Core Coil Assembly Housing:

Housed In The Tank Forming The Lower Part Of The Transformer

Casketed Joints Location:

Located Below Oil Level To Ensure Positive Sealing

Tank And Top Chamber Material:

Mild Steel

Storage Requirement:

Must Be Stored Vertically

Unpacking And Standing Requirement:

Must Be Unpacked Fully And Made To Stand Vertical Before Site Tests

External Surface Coating:

One Coat Of Primer And Two Coats Of Synthetic Enamel Paint Or Hot Dip Galvanized

Secondary Terminal Grounding Requirement:

One Terminal Of All Secondary Windings Not Being Used Must Be Grounded Before Energizing

Secondary Winding Placement:

Placed Over The Core Limb Prior To The Primary Winding

Oil Impregnated Paper Insulation Protection:

Preserved By Hermetic Sealing

Primary Winding Construction:

Pyramid Construction With Uniform Voltage Stress Grading

Primary Winding Insulation:

Suitable Alternate Layers Of Wire And Insulating Craft Paper

Trade Term:

To be discussed

Payment Term:

To be discussed

Internal Surface Coating:

Two Coats Of Oil-insoluble Paint

Primary Winding Configuration:

Two Halves In Unearthed Transformer, Single Unit In Earthed Transformer

Transformer Testing:

Undergoes All Routine Tests Before Dispatch

Maintenance Requirement:

Visual Inspection To Check Oil Level And Possible Leaks, Periodic Cleaning Of Insulator Surface Based On Site Pollution Level

Business Details

Country:

India

Business Types:

Not specified

Main Markets:

Not specified

Main Products:

Not specified

Year Established:

2011

Annual Revenue Amount:

Not specified

Numbers Of Employees:

Not specified

Preferred Payment Term:

Not specified

Preferred Trade Term:

Not specified

Port Of Loading:

Not specified

Product descriptions from the supplier

Tank and top chambers are made of mild steel. Their external surface is painted with one coat of primer and two coats of synthetic enamel paint or hot dip galvanized as per customer requirement. Their internal surface is painted with two coats of an oil-insoluble paint.
2. Hollow porcelain insulator conforming to IS: 5621 is mounted over the live terminal end of primary winding and is bolted to the tank. Maximum creep age factor of insulator shall be 3.5 for light or normal pollution level and 4.0 for heavy or very heavy pollution level whereas the minimum creep age distance in mm / kv of HSV shall be 16 or 20 for light or normal pollution level and 25 or 31 for heavy or very heavy pollution level respectively.
3. Primary winding consists of coated synthetic enamel round copper wire in suitable alternate layers of wire and insulating craft paper. It is wound in pyramid construction to have the voltage stress graded uniformly. In unearthed transformer, primary winding is done in two halves and in earthed transformer, it is done in single unit. The live end of the primary winding is connected to top chamber fitted to the top of insulator.
4. The secondary winding is placed over the core limb prior to the primary winding and the core coil assembly is housed in the tank forming the lower part of the transformer. Secondary terminals are brought out in the secondary terminal box on the side of the tank.
5. Insulation of VT is dried out by heating in vacuum. Dried and degassed oil conforming to IS:335 is then filled in the transformer under vacuum.
6. Di-electric strength of the oil-impregnated paper insulation is preserved by hermetic sealing of the transformer. Oil expansion is taken care by filling dry air above oil in the top chamber at atmospheric pressure. All the casketed joints are located below oil level to ensure positive sealing.
7.

Each transformer undergoes all the routine tests before dispatch and is delivered safe at site in duly packed condition. However, few precautions must be observed for its intended performance, which are as follows :

* Transformer is to be unpacked fully and made to stand vertical before carrying out site tests.
* Transformers are to be stored vertically. Before energizing, one terminal of all the secondary windings not being used is required to be grounded.

8. As the transformer is hermetically sealed, normal maintenance comprises of only visual inspection to check oil level and possible leaks besides cleaning insulator surface periodically depending on the pollution existent at site.

User Reviews

Like
Write a review
File a complaint

Supplier Review

Summary by Vivian

TRUST STARS

3.6/5

0 Reviews

Company Verification

1/4

Profile Completeness

44%

Avg. Product Score

0/5

Responsiveness

0%

Certification

-

Related searches

Frequently Asked Questions (FAQs)


You can contact verified India supplier Concord Electrical Industries through platforms like Freshdi.com to purchase Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble. For direct inquiries, please contact Concord Electrical Industries, the company’s representative. The supplier has a 3.6-star rating on Freshdi and has verified phone number. You’ll receive product details, pricing, and shipping terms directly from supplier.


Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble is sourced from India and meets international export standards. Key specifications include: Maintenance Requirement: Visual Inspection To Check Oil Level And Possible Leaks, Periodic Cleaning Of Insulator Surface Based On Site Pollution Level, Secondary Winding Placement: Placed Over The Core Limb Prior To The Primary Winding, External Surface Coating: One Coat Of Primer And Two Coats Of Synthetic Enamel Paint Or Hot Dip Galvanized, Oil Expansion Management: Filling Dry Air Above Oil In The Top Chamber At Atmospheric Pressure, Transformer Testing: Undergoes All Routine Tests Before Dispatch, Minimum Creepage Distance: 16 Or 20 Mm/kv For Light Or Normal Pollution Level And 25 Or 31 Mm/kv For Heavy Or Very Heavy Pollution Level, Trade Term: To be discussed, Payment Term: To be discussed


The supplier Concord Electrical Industries offers Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble at negotiation.

You are viewing details for Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble. The information provided here is either posted directly by the supplier, who is responsible for its accuracy, or collected by Freshdi AI from publicly available sources. Freshdi strives to make product information as useful and reliable as possible, but we do not guarantee complete accuracy. If you notice any incorrect or misleading details, please use the Report Product option so our team can review and address it quickly.

Negotiable

Min. order: Negotiable

1 yrs

India FlagIndia

3.6

Concord Electrical Industries

Year Established: 2011

Visit Store