
Share on
Negotiable
Product information
High-quality Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble supplied by Concord Electrical Industries. Bulk wholesale pricing is negotiable. Inquiry for latest prices.
16 Or 20 Mm/kv For Light Or Normal Pollution Level And 25 Or 31 Mm/kv For Heavy Or Very Heavy Pollution Level
3.5 For Light Or Normal Pollution Level And 4.0 For Heavy Or Very Heavy Pollution Level
Brought Out In The Secondary Terminal Box On The Side Of The Tank
Coated Synthetic Enamel Round Copper Wire
Dried And Degassed Oil Conforming To Is:335
Dried Out By Heating In Vacuum
Filling Dry Air Above Oil In The Top Chamber At Atmospheric Pressure
Hollow Porcelain Insulator Conforming To Is: 5621
16 Or 20 Mm/kv For Light Or Normal Pollution Level And 25 Or 31 Mm/kv For Heavy Or Very Heavy Pollution Level
3.5 For Light Or Normal Pollution Level And 4.0 For Heavy Or Very Heavy Pollution Level
Brought Out In The Secondary Terminal Box On The Side Of The Tank
Coated Synthetic Enamel Round Copper Wire
Dried And Degassed Oil Conforming To Is:335
Dried Out By Heating In Vacuum
Filling Dry Air Above Oil In The Top Chamber At Atmospheric Pressure
Hollow Porcelain Insulator Conforming To Is: 5621
Housed In The Tank Forming The Lower Part Of The Transformer
Located Below Oil Level To Ensure Positive Sealing
Mild Steel
Must Be Stored Vertically
Must Be Unpacked Fully And Made To Stand Vertical Before Site Tests
One Coat Of Primer And Two Coats Of Synthetic Enamel Paint Or Hot Dip Galvanized
One Terminal Of All Secondary Windings Not Being Used Must Be Grounded Before Energizing
Placed Over The Core Limb Prior To The Primary Winding
Preserved By Hermetic Sealing
Pyramid Construction With Uniform Voltage Stress Grading
Suitable Alternate Layers Of Wire And Insulating Craft Paper
To be discussed
To be discussed
Two Coats Of Oil-insoluble Paint
Two Halves In Unearthed Transformer, Single Unit In Earthed Transformer
Undergoes All Routine Tests Before Dispatch
Visual Inspection To Check Oil Level And Possible Leaks, Periodic Cleaning Of Insulator Surface Based On Site Pollution Level
India
Not specified
Not specified
Not specified
2011
Not specified
Not specified
Not specified
Not specified
Not specified
Tank and top chambers are made of mild steel. Their external surface is painted with one coat of primer and two coats of synthetic enamel paint or hot dip galvanized as per customer requirement. Their internal surface is painted with two coats of an oil-insoluble paint.
2. Hollow porcelain insulator conforming to IS: 5621 is mounted over the live terminal end of primary winding and is bolted to the tank. Maximum creep age factor of insulator shall be 3.5 for light or normal pollution level and 4.0 for heavy or very heavy pollution level whereas the minimum creep age distance in mm / kv of HSV shall be 16 or 20 for light or normal pollution level and 25 or 31 for heavy or very heavy pollution level respectively.
3. Primary winding consists of coated synthetic enamel round copper wire in suitable alternate layers of wire and insulating craft paper. It is wound in pyramid construction to have the voltage stress graded uniformly. In unearthed transformer, primary winding is done in two halves and in earthed transformer, it is done in single unit. The live end of the primary winding is connected to top chamber fitted to the top of insulator.
4. The secondary winding is placed over the core limb prior to the primary winding and the core coil assembly is housed in the tank forming the lower part of the transformer. Secondary terminals are brought out in the secondary terminal box on the side of the tank.
5. Insulation of VT is dried out by heating in vacuum. Dried and degassed oil conforming to IS:335 is then filled in the transformer under vacuum.
6. Di-electric strength of the oil-impregnated paper insulation is preserved by hermetic sealing of the transformer. Oil expansion is taken care by filling dry air above oil in the top chamber at atmospheric pressure. All the casketed joints are located below oil level to ensure positive sealing.
7.
Each transformer undergoes all the routine tests before dispatch and is delivered safe at site in duly packed condition. However, few precautions must be observed for its intended performance, which are as follows :
* Transformer is to be unpacked fully and made to stand vertical before carrying out site tests.
* Transformers are to be stored vertically. Before energizing, one terminal of all the secondary windings not being used is required to be grounded.
8. As the transformer is hermetically sealed, normal maintenance comprises of only visual inspection to check oil level and possible leaks besides cleaning insulator surface periodically depending on the pollution existent at site.
Supplier Review
Summary by Vivian
TRUST STARS
3.6/5
0 Reviews
Company Verification
1/4
Profile Completeness
44%
Avg. Product Score
0/5
Responsiveness
0%
Certification
-
You can contact verified India supplier Concord Electrical Industries through platforms like Freshdi.com to purchase Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble. For direct inquiries, please contact Concord Electrical Industries, the company’s representative. The supplier has a 3.6-star rating on Freshdi and has verified phone number. You’ll receive product details, pricing, and shipping terms directly from supplier.
Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble is sourced from India and meets international export standards. Key specifications include: Maintenance Requirement: Visual Inspection To Check Oil Level And Possible Leaks, Periodic Cleaning Of Insulator Surface Based On Site Pollution Level, Secondary Winding Placement: Placed Over The Core Limb Prior To The Primary Winding, External Surface Coating: One Coat Of Primer And Two Coats Of Synthetic Enamel Paint Or Hot Dip Galvanized, Oil Expansion Management: Filling Dry Air Above Oil In The Top Chamber At Atmospheric Pressure, Transformer Testing: Undergoes All Routine Tests Before Dispatch, Minimum Creepage Distance: 16 Or 20 Mm/kv For Light Or Normal Pollution Level And 25 Or 31 Mm/kv For Heavy Or Very Heavy Pollution Level, Trade Term: To be discussed, Payment Term: To be discussed
The supplier Concord Electrical Industries offers Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble at negotiation.
You are viewing details for Potential Transformer Tank And Top Chamber Material Mild Steel Storage Requirement Must Be Stored Vertically Internal Surface Coating Two Coats Of Oil-insoluble. The information provided here is either posted directly by the supplier, who is responsible for its accuracy, or collected by Freshdi AI from publicly available sources. Freshdi strives to make product information as useful and reliable as possible, but we do not guarantee complete accuracy. If you notice any incorrect or misleading details, please use the Report Product option so our team can review and address it quickly.

Negotiable
Min. order: Negotiable
Concord Electrical Industries
Year Established: 2011
Visit Store