This is the supplier profile page of V2 Engineering Systems, where buyers can explore products, connect directly with the supplier for pricing inquiries.

India FlagIndia

0

45, 3rd Main

Add Favorite

|

Report Supplier

|
This business has not been verified yet.
If you are the business owner, verify now to manage this profile and connect with verified buyers. Verify Now

Business Description

In todays competetive world it is in the virtue of every organization to reduce costs. One of the many costs for an engineering industry is the material costs and the process costs. Most of the machines or machine elements or equipments are designed about 25-30 years. Since a lot of things have changed in the past 30 years, may be the quality and reliability of materials, process parameters, design engineering technology, our market tendency, competition, or even the customer's requirements.

So it is in the interest of every organization to re-engineer or develop new products in line with the conditions prevalent today to make the products better adapted to the markets.

Experience shows that about 15% to 30% of extra material is present in any product which does not add to the safety or even the reliability of the material. Some times even with this extra material being present the equipment fails because of the stress concentration effect generated by the extra material. So always extra material does not mean safety.

Following are the savings in material that can be expected.

Machineries - 15% to 30% gearboxes - 20% to 35% material handling equipments - 15% to 40%

In todays world, it is required for every organization to identify and eliminate this over design, which really does not add value to the company, but it is eating away the profits and in some cases the market also due to the competition.

Services offered are

- Machine Weight optimization
- Machine capacity optimization
- New productdevelopment
- Machine design
- Machine Automation
- Re-engineering
- FEA Analysis
- Assembly optimization
- Machine optimization for process cost reduction
- DFMEA
- Solid modelling.

Trade Capabilities

Business Terms

Preferred Payment Term:

Not specified

Preferred Trade Term:

Not specified

Port Of Loading:

Not specified

Accepted Currency:

USD

Trade Ability

Annual Revenue Amount:

Not specified

Numbers Of Employees:

Not specified

Avg Response Time:

-

Products / Services Offered

Register Banner